Fully Rebuilt

We mean it.

Our frame-up restoration process includes:

-Full shell off frame restoration

-Custom furniture and carpentry

-Original design for layout and finishes

-Aircraft riveting and polishing

-Modern appliances: a/c, furnace, refrigerator, stove/oven, water heater

-All new electrical and plumbing systems

-Off grid capability with solar panels

About to lift the shell and attach it to the new subfloor.

From the frame up, each component is addressed. Axles, wheels, tires and brakes replaced.

From the frame up, each component is addressed. Axles, wheels, tires and brakes replaced.

Flipping it upside down makes it much easier! We raise and flip the Airstream frame in order to weld and paint the underside, install the new belly pan and replace the axles.

Video Block
Double-click here to add a video by URL or embed code. Learn more
All new electrical, plumbing, insulation and major appliances. Windows and door restored and weatherproofed. New subfloor with specialty coating.

All new electrical, plumbing, insulation and major appliances. Windows and door restored and weatherproofed. New subfloor with specialty coating.